1.
You’re a project manager at a wedding planning company. You’re working on a large wedding for a wealthy client, and your company has done several weddings in the past that were very similar to the one you’re working on. You want to use the results of those weddings as a guideline to make sure that your current project’s quality is up to your company’s standards. Which tool or technique are you using?
2.
Which Control Quality tool is used to analyze processes by visualizing them graphically?
3.
You are using a control chart to analyze defects when something on the chart causes you to realize that you have a serious quality problem. What is the MOST likely reason for this?
4.
The project team working on a project printing 3,500 technical manuals for a hardware manufacturer can’t inspect every single manual, so they take a random sample and verify that the manuals have been printed correctly. This is an example of:
5.
What’s the difference between Control Quality and Manage Quality?
6.
Which of the following BEST describes defect repair review?
7.
What’s the difference between Control Quality and Validate Scope?
8.
You are looking at a control chart to figure out if the way you are doing your project fits into your company’s standards. Which process are you using?
9.
When is inspection performed?
10.
Validated defect repair is an output of which process?
11.
Which of the following is associated with the 80/20 rule?