1.
An example of scope verification is:
2.
A new project has begun. The project charter has been written and the project manager has been assigned. The project manager is preparing the work breakdown structure for the project. The WBS is typically used for:
3.
A project manager is reviewing the work breakdown structure for her project. The WBS for the project represents:
4.
A project manager is creating a work breakdown structure for her project. In the breakdown structure the lowest level of the breakdown for the project manager is called the:
5.
A project manager has just become the manager of a project. The document that recognizes the existence of the project is called:
6.
Configuration management is:
7.
A project manager is employed by a construction company and is responsible for the furnishing of the completed building. One of the first things that the project manager for this project should do is to write a:
8.
A project manager is reviewing the scope of the project and the scope baseline of the project. This includes which of the following?
9.
The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called:
10.
A manager that manages a group of related projects is called a: